Fabrication of Structures for Shiploaders

In Q4 2019, the Yard started fabrication of steel structures ordered by Ultramar for four bulk cargo shiploaders designed by NK TEHNOLOGIJA, Latvia. The project was implemented as part of the Ultramar Terminal infrastructure development in the port of Ust-Luga, the Leningrad Region. The project activities were carried out in compliance with high quality requirements, the Yard being additionally certified to EN 1090 and EN 3834. Test assembly of the main structural elements was performed upon completion of the fabrication. In October 2020, the structures were shipped by sea to the port of Ust-Luga where they were assembled and commissioned by the Customer. OOO Kliver has gained extensive and successful experience in implementing crane projects and intends to develop its competencies in this area together with its key partners.

More
Upgrading of drilling rigs

Within upgrading of train-type drilling rigs, OOO Kliver produces mast and substructure units of 200 ton capacity capable of drilling with a top drive.

More
Fabrication of modules of a natural gas treatment unit and fabrication of piping for the Vysotsk LNG plant

Manufacturing of natural gas treatment unit modules for the LNG production and offloading terminal in the Vysotsk seaport in the Leningrad Region.

More
A set of large-diameter shells and inserts for the liquefied natural gas receipt and storage terminal

In November 2016, OOO Kliver was awarded a contract by JSC MRTS for fabrication of 22 off inserts and 4 sets of large-diameter shells within the project of construction of the Liquefied Natural Gas (LNG) Receipt, Storage and Regasification Terminal in the Kaliningrad Region.

More
Manufacture of 2 sets of a drilling rig BU E BM K-320

In 2015, OOO Kliver launched manufacture of BU E BM K-320 Kliver Cluster Slider drilling rigs of 320 ton capacity designed by Bentec GmbH Drilling and Oilfield Systems, Germany.